References

Chemical Projects

 

 

Start
End

Client
Country

Subject

Scope of Work

Number of Pieces
Size
Pressure
Temperature

5/2001
7/2001

KOVOPROJEKTA a.s.,
Brno
Czech Republic

Process units 3420, 3430, 3620 safety upgrade

Detail design

1 unit
Equipment upgrade

10/2001
11/2001

BORSODCHEM MCHZ s.r.o.
Ostrava - Mariánské Hory
Czech Republic

Design study of absorption part of technical acid production

Design study

1 line
220 t/day nitric acid

11/2001
06/2002

UNIPROGRAM Praha s.r.o.
Praha
Czech Republic

Tube bundles of furnace E 108

Detail design, equipment delivery

2 pcs
Heat transfer surface
1 x 320 m2;
1 x 485 m2
12.0 MPa
410°C

12/2001
08/2002

UNIPROGRAM Praha s.r.o.
Praha
Czech Republic

Tube bundles of furnace E 111

Detail design, equipment delivery

1 pc
D 1560 x H 8000 mm
11.8 MPa
540°C

3/2002
1/2003

LUKOIL NEFTOCHIM, Bourgas,
Bulgaria

UOP Process reactor and pressure vessels

Detail design, equipment delivery

5 pcs
reactor
D 2840 x H 21720 mm, 130 t
Other vessels
Up D 2400 x H 9200 mm
1.7 MPa
550°C

04/2002
12/2002

BorsodChem - MCHZ s.r.o.
Ostrava - Mariánské Hory
Czech Republic

Intensification of absorption column C-3070

Basic design, detail design, equipment delivery, erection, commissioning

1 line
220 t/day nitric acid
D 3180 x H 31500 mm
0.38 MPa
100 °C

5/2002
3/2003

SIIRTEC NIGI,
Itálie

Sulphur recovery unit

Equipment delivery

1 unit

7/2002
3/2003

MAŽEIKIU NAFTA,
Litva

Column K-302

Equipment delivery

1 pc

D 1800 x H 18450 mm
6,4 MPa

07/2002
06/2003

AZOT
Severodonětsk
Ukraine

Stripper of urea production

Detail design, equipment delivery

1 pc
Urea 1000 t/day urea
D 2200 x 11700 mm
16 MPa
225°C

02/2004
10/2004

PRECHEZA PŘEROV a.s.
Přerov
Czech Republic

Repair of heat exchanger
14-912

Detail design, equipment delivery, erection

1 pc
D 2600 x H 10730 mm
1 bar
Contact gas 430°C

02/2004
5/2005

HALDOR TOPSØE A/S
Denmark

Equipment for hydrogen production

Detail design, equipment delivery, erection, commissioning

1 line
6000 m3n/h H2
3.1 MPa
650°C

5/2005
9/2005

BC-MCHZ,
Ostrava,
Czech Republic

Process column re-qualification in pressure column

Detail design

1 unit
D 600 x 10800 mm
0,19 MPa
200°C

11/2005 10/2006

HALDOR TOPSOE A/S,
Denmark

Hydrogen production unit

Detail design, equipment delivery, erection, commissioning

1 unit
5 000 Nm3/hod
3,1 MPa
650°C

3/2006
8/2007

SPOLANA a.s.,
Neratovice,
Czech Republic

Sulphur acid final absorption tower (MECS process)

Basic design, detail design, equipment delivery, erection, commissioning

1 unit
500 t/day sulphur acid
D 3000 x 10500 mm,
0.11 MPa
172°C

5/2006 10/2006

SPOLANA a.s.,
Neratovice,
Czech Republic

DT 1403 A/B demonomere column efficiency increase

Detail design, equipment delivery, erection

2 unit
D 1600,
6 pcs trays added
0,8 MPa
150°C

6/2006
7/2006

BC-MCHZ,
Ostrava,
Czech Republic

Hydrogen production unit catalysts replacement

Detail design, replacement

1 unit
6 000 Nm3/hod

6/2006 11/2006

SPOLANA a.s.,
Neratovice,
Czech Republic

Polymer reactors process component dosing equipment

Detail design, building approval design

2 lines
14 reactors

1,6 MPa
180°C

6/2006 10/2006

SYNTHESIA a.s.,
Pardubice,
Czech Republic

Acid plant stack reconstruction

Detail design

1 unit
D 800 x H 30 000 mm

0.1 MPa
200°C

10/2006 12/2006

SPOLANA a.s.,
Neratovice,
Czech Republic

Polymer reactors de-foaming oil dosing equipment

Detail design, equipment delivery, erection, commissioning

2 lines
14 reactors

1,6 MPa
180°C

9/2006 3/2007

KOVOPROJEKTA a.s.
Brno
Czech Republic

Treating of sulphur emissions from selected process units

Detail design

9 process units
3.0 MPa
300°C

3/2007
4/2008

SPOLANA a.s.
Neratovice
Czech Republic

Modification of Waste water dechlorination

Detail design, equipment delivery, installation, commissioning

1 line
15 m3/h chlorine water
0.6 MPa
90°C

4/2007 12/2007

SPOLANA a.s.
Neratovice
Czech Republic

Retrofit of lye liquor collector TK 201

Detail design, equipment delivery, installation, commissioning

1 pc
D1600 x L 6500 mm
0.1 MPa
120°C

6/2007 8/2007

KOVOPROJEKTA a.s.
Brno
Czech Republic

Amine unit pipelines

Detail design

1 pc
1.5 MPa
170°C

5/2007 6/2007

SPOLANA a.s.
Neratovice
Czech Republic

Dosing of antioxidants and impregnates into the polymer reactors

Detail design, design for building approval

2 lines
14 reactors
1.6 MPa
180°C

1/2008 10/2010

SPOLANA a.s.
Neratovice
Czech Republic

Retrofit of SO2 production - line No. 2 

Basic design, design for building approval, detail design, equipment delivery, installation, commissioning

1 line
Combustion chamber 5.1 t/h of sulphur,
Fire tube boiler 18.5t/h,
Boiler DUMAG 500 Nm3/h natural gas
Boiler steam 215°C, 25 bar
ČSN

2/2008 3/2008

VIAMONT a.s.,
Ústí nad Labem,
Czech Republic

Removal of ion bisphenol production bottle necks - Phenol water extraction unit

Basic design

1 line
Capacity 680 kg/h of phenol waters (1 rotary disc extractor)

6/2008 8/2009

HALDOR TOPSOE A/S, Denmark

Hydrogen production unit

Detail design, equipment delivery, skid mounting erection

1 line
30 000 Nm3/h
ASME

5/2009 6/2009

SYNTHESIA a.s.,
Pardubice
Czech Republic

Detail design of column repair

Detail design

1 set
column D 3200, H = 32 500 mm, material 17246
4 bar 200°C
CSN

6/2010
7/2010

SPOLANA a.s.,
Neratovice,
Czech Republic

Retrofit of polymerization unit - I. stage

Basic design

24 000 kg PVC
Reactor 80 m3,
D 3980 x H 7400 mm
mat. SS
1,1 MPa, 80°C
CSN

8/2010
9/2011

SYNTHESIA a.s.,
Pardubice,
Czech Republic

Nitric acid production convertor with boiler

Detail design,
equipment delivery,
erection and instalation commissioning

33 600 Nm3/h nitric gases
14 t/h steam
convertor 0,25 MPa, 850°C,
boiler 3,7 MPa,
heater 4,0 Mpa, 460°C

8/2010
8/2011

LOVOCHEMIE a.s., Lovosice,
Czech Republic

Nitric acid production convertor with boiler

Detail design,
equipment delivery,
erection and instalation commissioning

36 000 Nm3/h nitric gases
16 t/h steam
convertor 0,25 MPa, 850°C,
boiler 3,7 MPa,
heater 4,0 Mpa, 460°C

12/2010
12/2011

HALDOR TOPSOE A/S, Denmark

Hydrogen production unit

Detail design, equipment delivery, skid mounting erection

1 line
26 000 Nm3/h
ASME

12/2011
1/2013

HALDOR TOPSOE A/S, Denmark

Hydrogen production unit

Detail design, equipment delivery, skid mounting erection

1 line
30 000 Nm3/h
ASME

8/2012
8/2013

BC-MCHZ, Ostrava, Czech Republic

Nitric Acid Plant Convertor Boiler

Detail design,
equipment delivery,
erection and instalation commissioning

1 set 33 600 Nm3/h of nitrous gas, overheated steam production 11 t/hod Convertor D4200 x H5700, boiler D2300 x H 4200, steam overheater D2100 x H500 SS, CS convertor 0,4 MPa; boiler 4,3 MPa,overheater 4,0 MPa convertor 880°C, overheater 460°C ČSN EN

5/2013
7/2013

LZ Draslovka, a.s., Kolín, Czech Republic

Cyanide finalization line

Detail Design documentation incl. Civil permit docs., technical supervision

1 set, 40t/day

1/2014
2/2014

LZ Draslovka, a.s., Kolín, Czech Republic

Ammonia Absorber

Tender contractual documentation for replacement of Ammonia Absorber

1 set, flow 19500 m3/h, D1800xL19000, 1.4571, 0,7bar, 200°C, ČSN + PED

12/2013 2/2015

PARAMO a.s., Pardubice, Czech Republic

Replacement of solvent cresol for NMP

Implementation documentation, equipment delivery & erection & commissioning

1 set 4000kg/h of VGO; equipment set; CS; 0,25bar(a) 200°C; ČSN

07/2014 12/2014

DUSLO a.s., Šala, Slovakia

New N30A/B Waste heat boiler coil internals

Thermal & strength calculation, design documentation, documentation delivery

2 sets 820t/d HNO3, 19t/h superheated steam; Evaporator D3200 x H 2000; Steam superheater D3200 x H500; CS, SS, Incoloy;
Evaporator 4,1MPa(a); Steam superheater 3,87MPa(a) Evaporator 250°C; steam superheater 430°C; ČSN EN

11/2014 06/2015

KOVOPROJEKTA a.s., Brno, Czech Republic

ACRYLONITRILE PLANT EXPANSION - piping design

Implementation documentation, documentation delivery

1 set; up to DN400, CS, SS, up to 44 bar, up to 550°C, ASME Code

12/2014
09/2015

SYNTHESIA a.s., Pardubice, Czech Republic

Equipment for nitrocellulose cutting

Implementation documentation, equipment delivery & erection & commissioning

1 set; Cutting of 800 - 1000 kg produced highly viscous nitrocellulose to pulpation value lying in the interval (80-90) ml / 10 g of dry nitrocellulose during cutting in 12 hours; 6300x4000 mm; CS; atm; ambient; ČSN

01/2015 07/2015

CS CABOT s.r.o., Val-Mez, Czech Republic

APH installation

Implementation documentation, equipment delivery & erection & commissioning

1 set Flue gas 37 000Nm3/h, 940°C; combustion air 18 000Nm3/h, 900°C; equipment set ;SS+CS; 0,55bar; 940°C ; ČSN EN

3/2015
06/2016

VUANCH a.s., Ústí n.L., Czech Republic

Experimental units for the project UniCRE

Implementation documentation, equipment delivery & erection & commissioning

9 sets; SS; up to 30MPa; up to 550°C; ČSN EN

10/2015 7/2016

DUSLO a.s., Šaľa, Slovakia

New N30A/B nitric acid boiler tube internals , 1Pc Economiser N11

Strength calculation and design documentation, equipment delivery & erection & commissioning

2 sets; 820t/d HNO3, 19t/h superheated steam Evaporator D3200 x H 2000, Steam superheater D3200 x H500, Economiser D3400xH5300 CS, SS, Incoloy Evaporator 4,1MPa(a), Superheater 3,87MPa(a); Ekonomizer 4,8MPa(a) Evaporator 250°C; Steam superheater 430°C; Ekonomiser 350°C ČSN EN

11/2015 09/2016

LOVOCHEMIE a.s., Lovosice, Czech Republic

Denitration column on nitric acid production line KD5

Basic & Detail design documentation, equipment delivery & erection & commissioning

1 set, Air with NOx 8500Nm3/h, nitric acid 22,4t/h, D1000 x H 51000, SS, 4 bar,100°C, ČSN EN

1/2017 8/2017

EXPLOSIA a.s., Pardubice, Czech Rep.
Building B315 gunpowder production technology modifycation
Detail Design documentation, equipment delivery & erection & commissioning
1 set   SS atm. 20°C ČSN
5/2017 12/2018
SYNTHESIA a.s., Pardubice, Czech Rep.
Nitrocellulose grinders reconstruction
Implementation documentation, equipment delivery & erection & commissioning 3 sets  CS, SS atm. 20°C ČSN